HOMEPostContact Us
Posted September 21. 2017 4:33PM

Maine firm gets $17M to repair berth 11 at Portsmouth Naval Shipyard

Click headline or here to open angled item
The work to be performed provides for repair/modernization of pile supported open wharf structures with the intent of restoring the load carrying capacity of the portal crane rail system along the waterfront and providing corrosion protection of the wharf to allow for continued optimal usage of the facility.


1015,1125,1456